You need to sign in to do that
Don't have an account?
SomeDude
Managed package version dependency - can i set managed package to require version 2 or later of parent package?
We have 2 managed packages that we develop.
Package 1 is a master package and package 2 is an addon with version dependency on package 1.
Is it possible for package 2 to require package 1 in version "2 or higher" or do i have to be always explicit about versions?
Package 1 is a master package and package 2 is an addon with version dependency on package 1.
Is it possible for package 2 to require package 1 in version "2 or higher" or do i have to be always explicit about versions?